One Team Builds Your Entire ADU — Foundation to Keys

No subcontractor coordination, no finger-pointing between trades. Our licensed construction team manages every phase, every inspection, and every detail.

What We Build

We construct detached ADUs, garage conversions, and install pre-fabricated units across Twin Falls and the Magic Valley. Every project includes licensed professionals for every trade, code-compliant construction to 2018 IRC standards, and a single point of contact from start to finish.

Detached New Build

Ground-up construction on your property. Custom design, full utility connections, and complete site work.

  • 500-1,200 sq ft
  • $150,000-$350,000+
  • 4-6 month build

Garage Conversion

Transform an existing garage into a fully permitted living space. Foundation work, insulation, new windows, and utilities.

  • 400-600 sq ft typical
  • $80,000-$150,000
  • 2-4 month build

Pre-Fab Installation

Factory-built modules delivered and installed on your prepared site. Foundation, utilities, and finishing on-site.

  • 400-1,000 sq ft
  • $120,000-$280,000
  • 8-12 week timeline

How We Keep Projects on Track

Regular Progress Updates

You receive photo updates and progress reports at every major milestone. You always know exactly where your project stands.

Single Point of Contact

One project manager coordinates all trades. You never have to chase down electricians, plumbers, or inspectors.

Code-Compliant Construction

Every phase is built to 2018 IRC standards and passes inspection the first time. We don't cut corners.

No Surprise Change Orders

Our Feasibility Check identifies issues before construction starts. The scope and budget are locked in before we break ground.

Construction Is Phase 3 of Our Process

We don't jump straight to building. Construction starts after your Feasibility Check and Design are complete. This means every decision has been made, every permit is in hand, and the budget is locked in before the first shovel hits the ground.

The Construction Process

How It Works

1

Site Preparation + Foundation

Excavation, grading, utility trenching, and foundation work. Concrete footings and slab or crawlspace per your design and Idaho soil conditions.

2

Framing + Exterior

Wall framing, roof structure, windows, doors, and exterior sheathing. Engineered for Twin Falls snow loads and wind conditions.

3

Rough-In: Plumbing, Electrical, HVAC

All mechanical systems installed by licensed professionals. Separate inspections for each trade before walls are closed.

4

Insulation + Drywall

Insulation installed to meet climate zone 5B/6B R-value requirements. Drywall hung, taped, textured, and ready for finishes.

5

Finishes + Fixtures

Flooring, cabinetry, countertops, tile, paint, fixtures, and appliances installed. This is where your ADU comes to life.

6

Final Inspection + Handoff

Final building inspection, Certificate of Occupancy issued, and we hand you the keys to your finished ADU.

Project Gallery

Detached ADU exterior with siding and sliding glass door

Foundation & Framing

ADU bathroom with marble tile shower and modern finishes

Interior Finishes

Completed ADU exterior with front porch and modern railings

Completed ADU

Ready to Build?

Every project starts with a free Readiness Call. We'll discuss your property, goals, and timeline — then map out the path to your finished ADU.