Know Exactly What You Can Build — Before You Spend a Dime on Design

Our ADU Feasibility Check answers every question: Can I build? How big? How much? How long? What's my best financing option? All in one comprehensive report.

Why Start with a Feasibility Check?

Most ADU projects stall because homeowners invest in design before understanding their constraints. They pay an architect $3,000-$5,000 only to discover their lot has a utility easement, their setbacks are tighter than expected, or the project costs more than they budgeted.

Our Feasibility Check eliminates that risk. For $250-$750, you get a complete picture of what's possible on your specific property — and if you proceed with us, the fee is credited toward your build.

What Your Feasibility Report Includes:

  • Site measurements and photos — exact buildable area on your lot
  • Zoning and setback verification — your district (R-2, TN-1, TN-2, TN-3, RR), setbacks, and the 45% size calculation confirmed with Twin Falls P&Z
  • Utility capacity assessment — per Title 10-6-10-B, your ADU must share water, sewer, and sanitation with the primary dwelling (no separate meters), so we verify your home's capacity
  • Placement recommendations — best location for your ADU
  • Budget range — Good / Better / Best options with cost breakdowns
  • Realistic timeline — from design through Certificate of Occupancy
  • Permit path — what's required for your specific jurisdiction
  • Financing checklist — HELOC, construction loan, and other options
$250-$750
Investment
Credited toward build
1-2 Weeks
Report delivery
After site visit
100%
Clarity
Before you commit

Garage Conversion or New Build?

Not sure which approach is right? The Feasibility Check evaluates both options. If you have an existing garage, we assess whether conversion makes sense structurally and financially — or whether a new detached build is the better investment. You get the comparison in your report.

How the Feasibility Check Works

A straightforward 4-step process to get the answers you need

1

Book Your Readiness Call (Free)

A 10-15 minute phone call where we learn about your property, goals, and timeline. We determine if a Feasibility Check is the right next step.

2

On-Site Visit + Assessment

We visit your property to take measurements, assess utility access points, evaluate soil and drainage conditions, and document everything with photos.

3

Research + Analysis

We verify zoning, setbacks, and lot coverage with Twin Falls Planning & Zoning. We research utility capacity and identify any potential obstacles.

4

Your Feasibility Report

You receive a comprehensive report with placement recommendations, budget range (Good/Better/Best), timeline, permit path, and a personalized financing checklist.

Questions the Feasibility Check Answers

?Can I legally build an ADU on my lot?
?How big can my ADU be?
?Where on my property should it go?
?Can my utilities handle an additional unit?
?How much will it cost (realistically)?
?How long will it take from start to finish?
?What permits do I need?
?How should I finance it?
?Should I convert my garage or build new?
?What will the ROI be?

Get Your Feasibility Check

Start with a free 10-15 minute Readiness Call. If an ADU looks viable, we'll schedule your Feasibility Check and you'll have your complete report within 1-2 weeks.